PRODUCTS

Testing Commissioning & Training

Upon overall system installation completed, our experience engineers will carry out testing commissioning process whereby having I/O testing, load cell calibration, sequence testing, interlocking testing, dry test and finally product test fine tuning the system for better accuracy weighing, time saving etc to ensure meeting the customer requirement.

Upon completion, customer would have the PLC automation system to monitor and control the related production flow, better inventory control, accurate batching, lesser manpower, lesser raw material cost, cleaner working environment etc

Upon acceptance, we shall prepare the training to train the customer team for system philosophy on application, equipment accessories introduction, operation, maintenance, troubleshooting etc.

Operation Manual with mechanical & electrical drawings will be provided for customer reference.